High-banking turns nonetheless await crew – Racing: “The old asphalt remains in Turns 1 and two, with the exception of the concrete pad utilized to patch the racetrack following the Daytona 500 pothole incident, which forced two extended delays for the duration of NASCAR’s biggest occasion.
The massive slab of concrete was extracted from the course by a Lane Building detail, much like a dentist pulling a tooth.
The Speedway had no comment on what will occur to the large, concrete patch.”
High-banking turns nevertheless await crew - Racing
Hiç yorum yok:
Yorum Gönder